Global Ports Accelerate Electrification for a Greener Future

Discover how ports are adopting shore power and clean energy solutions to reduce emissions and drive sustainable growth.
AURALIS Port
A shore power project connects the available grid supply to the vessel’s electrical requirements while it is at berth. The starting points are vessel demand, available voltage, frequency, berth layout and connection requirements.

Select the appropriate voltage class

AURALIS offers AC60 low-voltage and GYBP60 high-voltage shore power systems. Review the product specifications and discuss the berth requirements with the engineering team.

Questions to resolve before selection

Before comparing equipment, document the vessel load, berth operating pattern, available grid voltage and frequency, and the intended cable and connector arrangement. These inputs help define a configuration for discussion; they do not replace an electrical design for the site.

  • Confirm the vessel and berth interface
  • Record available grid capacity and supply characteristics
  • Review low- and high-voltage system options

Explore shore power systems or share your requirements with the engineering team.